The governing load-case on this 1,800m² (19,375f²) Enviro-Mat® area was 25Te/m² (5,221psf). As material to stabilize we used locally available crushed gravel. The customer needed a last minute solution for upgrading the bearing capacity of this location. We designed and constructed the Enviro-Mat® Hardstand in just 6 weeks’ time.