Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/hdp/domains/heavydutypavements.com/public_html/wp-includes/functions.php on line 6121 Temporary Hardstands for an Oil Rig (Schoonebeek, The Netherlands) – Heavy Duty Pavements
Temporary Hardstands for an Oil Rig (Schoonebeek, The Netherlands)
The governing load-case on this 9,200m² (99,027f²) Enviro-Mat® area was 25Te/m² (5,221psf). As material to stabilize we used locally available crushed gravel which could be re-used on following hardstand locations in the project.