Offshore wind Marshalling Yard (Maasvlakte II, The Netherlands)
The governing load-case on this in total 2,500m²(26,909f²) large Enviro-Mat® storage/transition area was 50Te/m² (10,405psf). As material to stabilize we used 40% locally available sand and 60% Crushed Concrete debris.