Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/hdp/domains/heavydutypavements.com/public_html/wp-includes/functions.php on line 6121
Lekki Free Zone, Lagos State Nigeria – Heavy Duty Pavements

Hardstands- & Assembly areas, storage areas Nigeria

Lekki Free Zone, Lagos State Nigeria

Thumbnail of
Thumbnail of
Thumbnail of
Thumbnail of

In this project we were asked to apply the Enviro-Mat® solution on an greenfield area which had been reclaimed from the Sea only a few Years before the start of the project/

The governing load-cases on this project went up to 40Te/m®(8,324psf). In total we designed and constructed 70 Hardstands and Assembly areas for many different Ring- & Crawler Cranes and over 250,000m² (2,690,978sf²) Storage area.                    

As material to stabilize we only used the Silty sand which was reclaimed from the Sea.

Need ground stabilization for your next project?

Get in touch