Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/hdp/domains/heavydutypavements.com/public_html/wp-includes/functions.php on line 6121
Crane Hardstand for an LR1750 (Wanze, Belgium) – Heavy Duty Pavements

Crane Hardstand for an LR1750 (Wanze, Belgium)

Thumbnail of
Thumbnail of
Thumbnail of
Thumbnail of

The governing load-case on this 1,800m² (19,375f²) Enviro-Mat® area was 25Te/m² (5,221psf). As material to stabilize we used locally available crushed gravel. The customer needed a last minute solution for upgrading the bearing capacity of this location. We designed and constructed the Enviro-Mat® Hardstand in just 6 weeks’ time.

Need ground stabilization for your next project?

Get in touch